Fast-Track 14-Day Headquarters Reconfiguration — Mohandessin

9th Floor Mohandessin — Transforming executive office floors for 120 staff in a rapid 14-day turnaround.

Fast-Track 14-Day Headquarters Reconfiguration — Mohandessin

Project Overview & Context

Abu Dhabi Commercial Bank (ADCB) appointed Black Stone to execute the fast-track architectural and MEP reconfiguration of its 9th-floor executive headquarters in Mohandessin, Giza.

The project required preparing the floor to accommodate 120 relocating senior managers and regional directors, integrating executive conference rooms, acoustic glass partitions, heavy-traffic flooring, and high-density electrical and data networks.

The 14-Day Fast-Track Challenge

The bank set an inflexible 14-day completion deadline tied to executive arrival schedules from UAE headquarters. Delivering demolition, partition assembly, ceiling remediation, and new electrical circuits in 2 weeks required zero room for logistical delays or rework.

24/7 Shift Synchronization

Black Stone deployed 13 multidisciplinary technical squads running synchronized 24/7 non-stop rotational shifts under 2 resident site engineers. Power distribution was redesigned with dedicated circuit breakers to avoid overloading, completing all works on day 14 to perfection.

Executed Scope Checklist

14-Day Fast-Track Fit-Out
Acoustic Double-Glazed Partitions
Heavy-Traffic Anti-Static Carpet
High-Density Data & Power Drops
Executive Boardroom AV Integration
Load-Balanced Circuit Distribution